← Back to Cooperative Index

How do we power our world?

Start with the big picture. Open the sections below to see the evidence and future goals.

73/100Comparison scoreAn editorial model, not a scientific grade.
6Milestones to exploreA mix of capabilities and future goals.
4Linked measurementsOpen a measurement for its source and date.
Cooperative Index SCORE
73/100Index weight 15

Progress Scale progress

45% toward Level 2Dependency weight 7
Tailwind: AI, Money & CapitalHeadwind: Peace
REFERENCE MEASURE

0.73 · Kardashev K
world energy ≈ 2.0 × 10¹³ W

Steps toward the future

Explore the milestone ladder
  1. nowFossil-dominated grid (86% of primary energy)LEVEL 2
  2. doneRenewables overtake coal in electricity2025LEVEL 2
  3. doneFusion ignition, Q > 1Dec 2022LEVEL 2
  4. nextFusion pilot plant on the grid (Helion / CFS ARC)2028–early 2030sLEVEL 2
  5. plannedITER full deuterium–tritium operation2039LEVEL 3
  6. farKardashev Type I — harness all sunlight reaching Earth~2,000× today's powerLEVEL 4

Economic conditions for progress

Explore IMF findings on fiscal pressure, AI investment, trade and digital-finance risk.

Read the 2026 IMF research brief ↗

Human dimensions

Architecture & living spaces ↗

Related measures within Humanity.

NATURAL SYSTEMS

Resources & nature

Explore planetary boundaries, renewable energy, mineral supply, forest change and species conservation, with source dates and scope.

Open resources dashboard ↗
POSSIBLE ROUTE FORWARD

Action path

2028–2032Editorial horizon
TARGET

Level 2: >50% clean electricity; first fusion plant on the grid

Explore the possible steps

Possible steps

  1. Overbuild solar + storage (solar generation +30% in 2025)
  2. Electrify heat and transport to absorb it
  3. Fusion pilots prove the second half (Helion 2028, CFS ARC early 2030s)
  4. Clean share crosses 50%
THE CRUX · DECISION POINT

Grid interconnection and permitting, not generation — the approved-but-unconnected queue

IF THE MAINLINE STALLS

Fission renaissance carries base load if fusion slips: China's build rate plus Western SMR fleets

What to watch

GW of solar and storage connected per year; first fusion plant's Q and uptime

Related snapshot measures

These are the available measures in the supplied dataset; they may be proxies for the leading indicators above.

K is logarithmic: Level 3's K ≥ 0.85 needs ~16× today's power. The near-term score is the clean share.

A scenario from the supplied handoff, not a prediction or professional advice.

Sourced indicators / 4

Open a measurement to see where it comes from.

See measurements & sources
Report an issue
New here? What the labels mean

Reported fact

A number from a named source. Check when, where and what it measures.

Model or score

A way to compare things using chosen rules. Different rules can give different scores.

Future goal or scenario

Something we hope to achieve, or imagine might happen. It is not a measured fact.

Milestone
An important step toward a goal.
Indicator
A measurement that helps us understand something.
Dependency
Something that may need help from something else.
Biodiversity
The variety of living things.
GW
Gigawatts: a unit of power. Capacity is what equipment can produce at its rated output.